New ticket submitted by Stephan Hoffmann at 2011/01/28 10:38
Tracking System: Bugs
Category: Projectmanager
Version: Version 1.8.001
Status: Open
Completed: 0%
Priority: 5 - medium
Created By: Stephan Hoffmann
Created on: 2011/01/28 10:38
Assigned to: Ralf Becker
Summary: #2820 - Transient wrong accumulated time in project manager display
After creating some subprojects and moving existing “Stundenzettel” entries from the main project to the subprojects the accumulated time was displayed with a wrong value. Clicking “Alles synchronisieren” did not repair this, but after changing to the “Admin” page and back to the Project Manager the value got corrected.
I did not manage to reproduce this on your demo page, but here I can. After moving one hour to a subproject already containing 4 time entries that sum up to 19 hours the subprojrct’s totel time is displayed as 2.875 days instead of 2.5 days. After moving back the display git updated to 2.75 days instead of 2,375. This time I cannot get back the correct time display, even after logging out and in again.
linked entries:
http://www.egroupware.org/egroupware/index.php?menuaction=tracker.tracker_ui.edit&tr_id=2820&no_popup=1