I have a project with 2 users, one is the coordinator and the other is the project
member.
I added a tracking system and I sent an e-mail notification to both of them.
If the modifications of the tracking system are made by the coordinator, it
doesn´t send an e-mail with the notification. By the other side, if the the
modifications are made by the project member, the egroupware sends an email to the
coordinator.
Could you help us???